Tuesday 25 March 2014

Group Meeting (25/03/2014, 10am, Social Sciences Library)

This was our first meeting as a group and we finalized and proof read the team charter which is to be handed in at the workshop in the afternoon. No new ideas were brought forward regarding the project. Further brainstorming will be required before next meeting.

Meeting 1 Minutes:
Date: 25/03/2014
Opened: 10.05am
Present: Daniel, Matt, Liam, Yang, Victoria, Francesca

Things Completed:
  • Change of team name from "ThatWillBeANegative" to "Critical Attack Design"
  • The team charter was finalised, printer and signed by each member present.
  • The best online collaboration method was discussed and we agreed that the facebook group will be the primary tool for reviewing, uploading and revising team documents. A google drive was also set up to contain all the important documents to submit.
To Complete:
  • Update blog with meeting minutes and ideas.
  • Make sure that everyone has access to the blog.
  • Come up with a good idea for the project.
  • Work out a suitable meeting time that everyone can attend as Ailee has a tutorial in this current time frame.
Closed: 10.35am
Next Meeting: TBA

No comments:

Post a Comment